75 MW GoliatVind Floating Offshore Wind Farm - Electrical Grid Connection
75 MW GoliatVind Floating Offshore Wind Farm - Electrical Grid Connection
Æge Energy has provided support to GoliatVind 75 MW floating offshore wind farm, including securing the project's grid connection, supporting the electrical system integration with Goliat FPSO, electrical system design and grid compliance advice and input to environmental impact assessments.
Æge Energy has provided support to GoliatVind 75 MW floating offshore wind farm, including securing the project's grid connection, supporting the electrical system integration with Goliat FPSO, electrical system design and grid compliance advice and input to environmental impact assessments.
GB Market Entry Paper
GB Market Entry Paper
Æge has carried out a review of the grid connection process in the UK to support the client's market entry strategy. The report outlines the steps, requirements and challenges involved in securing a grid connection, highlighting how regulatory and technical frameworks directly impact business development.
Æge has carried out a review of the grid connection process in the UK to support the client's market entry strategy. The report outlines the steps, requirements and challenges involved in securing a grid connection, highlighting how regulatory and technical frameworks directly impact business development.
The report includes a review of:
- Regulatory landscape
- Processes for grid connection in GB
- ScotWind/INTOG
- Connections Reforms / TM04+ (Queue Position and Queue Management reforms)
- Holistic Network Design (HND)
- TEC register
- Review of specific grid areas
Nettilknytningsstudie ScotWind
Nettilknytningsstudie ScotWind
Det ble gjort en vurdering av mulige tilknytningspunkter og kapasitet i nettet (SSEN / SPT / NGET national grid) for opptil 20 GW med bunnfast og flytende havvind. Analysen inkluderte tekniske hensyn, tilknytningsteknologier- og konsept, en vurdering av planlagte nettoppgraderinger, produksjonskapasitet og ulike scenarioer for fremtidig energibalanse, samt potensiale for hybrid tilknytning (utenlandskabler og andre fremtidige verdikjeder).
Due diligence HVDC interconnector project
Due diligence HVDC interconnector project
Æge Energy was commissioned by a potential investor to conduct a due diligence of the Greenlink interconnector project. The review included technical, commercial, permitting, organisational and regulatory aspects of the project.
Æge Energy was commissioned by a potential investor to conduct a due diligence of the Greenlink interconnector project.
Project facts:
The Greenlink interconnector is a subsea high-voltage direct current (HVDC) cable system that connects the power markets of Ireland and Great Britain, stretching approximately 190 km underground and under the sea between County Wexford in Ireland and Pembrokeshire in Wales.
- Review of Technical, Regulatory, Procurement Strategy, Project Management/Organisational and Permitting aspects
- Site inspection of land fall, converter sites and onshore cable routes
- Development of risk register and contingencies for development and construction phases
- CAPEX/OPEX/DEVEX review
- Development of comprehensive cost model
- Development of cost database for HVDC projects (interconnectors and offshore wind)
- Development of Construction Schedule and proposed Construction Management Organisation